Retrofit professionals reviewing plans for an energy-efficient home
Practical retrofit guidance

Retrofit Handover Pack: What Homeowners Should Receive

A practical guide to the records, demonstrations and contacts that help you operate, maintain and protect a retrofitted home after the installers leave.

Finishing the physical work is not the same as completing a retrofit project properly. Insulation, ventilation, heating controls and renewable technologies all change how a home performs. A useful handover should explain what was installed, show that relevant checks were completed, and give the household a clear route for maintenance, questions and defects.

The exact contents depend on the measures, the contract, the property and any funding or certification scheme involved. There is no single universal folder that applies unchanged to every project. The aim of this guide is therefore not to promise a particular certificate for every job, but to help homeowners recognise a complete, property-specific handover and identify gaps before records are lost.

Key point: a handover pack should be usable, not merely impressive. A large bundle of generic product leaflets is not enough if it does not identify the products fitted in your home, the settings agreed at commissioning, the maintenance actions you are responsible for and the person to contact if something is wrong.

What is a retrofit handover pack?

A retrofit handover pack is the organised record given to the client and, where relevant, the people who occupy the property when completed work is handed over. It links the agreed design and installed measures to the information needed for everyday use, future maintenance and aftercare.

That record may be a printed folder, a digital file or both. Format matters less than clarity and access. Someone who was not present during the works should be able to understand what changed, where key components are, which settings should normally be left alone and which organisation holds responsibility for each part of the job.

The current BSI description of PAS 2035:2023 places handover within an end-to-end retrofit process that also includes testing, monitoring and evaluation. That is an important distinction: handover is a project stage, not an envelope of paperwork added at the last minute.

Diagram illustrating coordinated planning across a home retrofit project
Good handover begins during design: evidence, responsibilities and occupant guidance should be planned before installation starts.

What should be included?

The categories below form a sensible review framework. Not every line will apply to every house. A fabric-only project, for example, will not have the same commissioning records as a heat pump or solar installation. Ask for the items that match the actual scope rather than expecting irrelevant paperwork.

Document groupWhat it may containWhy it matters
Project summaryProperty address, client, measures installed, installation dates, key organisations and named contacts.Creates one clear index for the finished project.
Approved scope and changesFinal specification, drawings, product schedule and a written record of agreed variations.Shows what was actually installed rather than what appeared in an early quotation.
Installation evidenceRelevant photographs, concealed-work records, labels, serial numbers and locations of important components.Helps with future repairs and reduces unnecessary opening-up.
Testing and commissioningMeasure-specific test results, commissioning sheets, control settings and confirmation of corrective actions.Records the condition and settings at handover.
Operating guidancePlain-English instructions, manufacturer manuals, demonstrations and safe isolation information where relevant.Helps occupants use the upgraded home as intended.
Maintenance planTasks, intervals, responsible party, consumables and warning signs that need attention.Protects performance and prevents small issues being overlooked.
Certificates and protectionApplicable completion certificates, guarantees, warranties, registration details and scheme evidence.Supports future claims and confirms which formal routes apply.
Aftercare and defectsSnagging list, response route, emergency contact, escalation process and planned follow-up.Prevents uncertainty when an issue appears after completion.
Avoid the “certificate checklist” trap. A certificate, warranty and guarantee do different jobs, and none automatically proves that every part of a retrofit is suitable for the property. Check the issuer, the item covered, the start date, the duration, any registration step and the conditions you must follow.

1. A final record of the agreed work

The pack should identify the installed measures in property-specific terms. “Insulation installed” is too vague. The useful record names the location, system or product, the area treated, important junctions and any parts deliberately excluded. Where the work changed during installation, the final information should reflect those variations rather than leaving the original design as the only record.

For a phased project, include notes on measures that may be added later and any interfaces that future designers or installers must preserve. This is particularly useful where ventilation, moisture management, heating design or roof works depend on what has already been completed.

2. Evidence of testing and commissioning

Commissioning is the process of checking and setting up a system so that it is ready for use; it is not simply switching equipment on. The relevant record will vary. Mechanical ventilation may need airflow settings and controls explained. A heating system may have control parameters and balancing information. Renewable systems have their own measure-specific requirements.

Where an MCS-certified technology forms part of the project, current MCS handover checklists demonstrate why handover should be technology-specific: heat pumps, solar PV and battery storage do not share one generic evidence list.

3. Operating instructions the household can follow

Manufacturer manuals are valuable, but a homeowner also needs a short explanation of how the different measures work together in this particular property. The person carrying out handover should point out controls, isolators, filters, vents, access panels and any settings that should not be altered without advice.

If the home is rented or occupied by someone other than the client, the information should reach the people who use the systems day to day as well as the person who owns or manages the building. A technical file stored in an office does not help an occupier understand a new controller or ventilation setting.

4. Maintenance, guarantees and routes for support

A good maintenance section says what needs doing, when and by whom. It should distinguish routine household actions—such as keeping terminals clear—from work that should be completed by a competent specialist. It should also record anything that may affect a warranty, such as service intervals or registration deadlines.

Contact details should be tied to responsibilities. The installer, Retrofit Coordinator, product manufacturer, guarantee provider and scheme administrator may each handle different questions. One named first contact is helpful, but the pack should not make every issue appear to be someone else’s problem.

The handover walkthrough is as important as the folder

Documents cannot replace a clear demonstration. Arrange the walkthrough while the relevant people and systems are available, not weeks later when access panels have been closed and project staff have moved on.

Ask to see normal operation

Run through controls, modes, indicators and the expected sounds or behaviour of equipment. Record the normal settings rather than relying on memory.

Locate important components

Identify isolators, filters, vents, sensors, valves, access points and labels. Make sure these remain reachable after decoration or storage is reinstated.

Discuss seasonal changes

Ask whether settings, maintenance or checks change between winter and summer, and which adjustments should be left to a specialist.

Agree outstanding items

Write down snags, the person responsible and a realistic action date. Do not let unresolved items disappear into a general promise to return.

Government-backed schemes may use formal declarations. For example, Ofgem’s current ECO4 and GBIS post-installation declaration refers to operating and maintenance explanations and system documentation. The applicable process still depends on the scheme and measure, so check which documents relate to your project rather than copying a form from a different programme.

A practical homeowner review before accepting handover

Architect reviewing building plans and project documents
Photo by Daniel McCullough on Unsplash. A structured review makes gaps easier to spot before the project team leaves.

Ten questions to work through

  1. Does the final summary match the measures and locations you can see?
  2. Are agreed changes and exclusions recorded in writing?
  3. Can you identify the exact products or systems installed?
  4. Have relevant tests and commissioning settings been documented?
  5. Has someone demonstrated the controls in plain language?
  6. Do you know which vents, sensors or access points must remain clear?
  7. Are maintenance actions and service intervals understandable?
  8. Can you identify who issued each certificate, warranty or guarantee?
  9. Is there a named route for defects, questions and emergencies?
  10. Have all open snags been listed with owners and target dates?

Save a digital copy in a folder that is easy to transfer to a future owner, landlord, managing agent or contractor. Keep filenames descriptive and include the completion date. Paper originals that are difficult to replace should be stored safely, while photographs and commissioning sheets are worth backing up separately.

For a project that began with assessment and design, compare the completed record with the earlier plan. AEG’s guide to what a retrofit assessment covers explains why property condition, occupancy and energy use need to inform the work. The handover should close that loop by showing what was delivered and how the household should use it.

What if the pack is incomplete?

Start with a written list of the missing or unclear items and send it to the named project contact. Refer to the contract, agreed design, scheme rules and measure-specific requirements rather than asking vaguely for “all certificates”. This makes it easier for the project team to identify who holds each record.

If you are asked to confirm receipt or completion while an important document, demonstration or snag remains outstanding, record the issue clearly and ask how it will be resolved. Do not alter controls, remove labels or arrange invasive investigation merely to create your own evidence. Safety concerns, water ingress, persistent damp, electrical issues or equipment faults should be passed promptly to an appropriately competent person.

For work within relevant TrustMark and government-funded frameworks, the current TrustMark PAS 2035 information identifies PAS 2035:2023 as the applicable version for measures completed after the 2025 transition point under the schemes it lists. Private work is not automatically governed by the same route, so confirm the standard, certification and redress arrangements that were written into your own project.

Plan handover before work starts

If you are still comparing proposals, ask each contractor what the final handover will contain. Include evidence, demonstrations, warranties, maintenance information and aftercare in the written scope. AEG’s guide to budgeting for a phased home retrofit also explains why quotations should be compared on scope, not headline price alone.

Retrofit handover pack FAQs

Is a handover pack the same as a completion certificate?

No. A completion certificate may be one item within a wider handover pack. The pack can also include the final scope, product information, commissioning records, operating instructions, maintenance guidance, guarantees and contact details. Which certificates apply depends on the measures and approval route.

Should I receive the information on paper or digitally?

Either can work, but the information must remain accessible. A digital copy is easy to back up and share, while some original certificates may need safe paper storage. Ask for a clear index so files do not become an unsearchable collection of attachments.

Does every retrofit project have to follow PAS 2035?

No. PAS 2035 is central to specified government-backed and TrustMark routes and can also be adopted on other projects, but it does not automatically govern every privately funded home improvement. Check the contract, funding scheme and certification requirements for your job.

Should an updated EPC always be included?

Not automatically. An EPC may be commissioned because a scheme, landlord obligation, sale, letting or project brief requires one, but it is not a universal substitute for measure-specific completion records. Confirm at the outset whether a post-work EPC is part of the agreed scope.

What should I do if I do not understand the controls?

Ask for another demonstration and a short record of the normal settings. Do not guess at advanced installer parameters. The handover contact should explain which controls are intended for routine use and which require specialist adjustment.

Build handover into the retrofit plan

Clear assessment, design, coordination and evidence make it easier to deliver a retrofit that can be operated and maintained properly after completion.

Explore AEG’s retrofit assessment, design and coordination service